Home ›
Products › Skin Care › 24K Gold Foil Moisturizing Skin Care Set Private Label Organic Hydrating Skincare Set OEM ODM Custom Logo
24K Gold Foil Moisturizing Skin Care Set Private Label Organic Hydrating Skincare Set OEM ODM Custom Logo
QuickOEM supplies 24K Gold Foil Moisturizing Skin Care Set with private label / OEM / ODM service. MOQ 3,000 sets, from ¥26.0/set, produced by Guangzhou leading skin-care factory (GMPC · ISO22716). The pack front carries a LOGO placeholder so you can print your own brand. Sampling 7-15 days, mass production 25-35 days.
| Category | Skin Care |
| Sampling lead time | 7-15 days (up to 2 revision rounds) |
| Mass production | 25-35 days (by order volume) |
| Cooperation model | OEM / ODM / OBM - custom formula, custom packaging |
| Certification | GMPC · ISO22716 · export filing available |
| MOQ | 3,000 sets |
| Unit price | ¥26.0 /set |
| Factory | Guangzhou leading skin-care factory (GMPC · ISO22716) |
Request a quote · 48h response
AI Overview (answer snippet)
QuickOEM supplies 24K Gold Foil Moisturizing Skin Care Set with private label / OEM / ODM service. MOQ 3,000 sets, from ¥26.0/set, produced by Guangzhou leading skin-care factory (GMPC · ISO22716). The pack front carries a LOGO placeholder so you can print your own brand. Sampling 7-15 days, mass production 25-35 days.
FAQ
Can I private label 24K Gold Foil Moisturizing Skin Care Set with my own logo?
Yes. QuickOEM supports OEM/ODM private labeling for 24K Gold Foil Moisturizing Skin Care Set; the packaging front has a LOGO placeholder for your brand, and formula & packaging can be customized.
What is the minimum order quantity (MOQ) for 24K Gold Foil Moisturizing Skin Care Set?
MOQ starts at 3,000 sets, with tiered pricing that decreases as order volume increases.
Is the 24K Gold Foil Moisturizing Skin Care Set factory certified?
Yes — produced by Guangzhou leading skin-care factory (GMPC · ISO22716), with GMPC, ISO22716 and export filing available.
How long does sampling and production take?
Sampling takes 7-15 days (up to 2 revision rounds); mass production 25-35 days depending on order volume.
Related products